The roofing felt under the tiles was in very poor condition so the client wanted the roof refurbished at the same time as the solar panels were installed. We worked with our roofing partners, JHM, to provide a solution that satisfied both requirements.
The scaffolding provided by Lambert Scaffolding was described by the customer as a work of art. It bridged across the 10 metre wide full width conservatory at the rear avoiding removing panels in the conservatory roof.
A 3.92 kWp solar system was installed with 16 x 245Wp Sano panels split into two strings and managed by a Fronius IG 35 Plus inverter. The system is predicted to generate 3442 kWh unit per year.